Renovation and Expansion of ASM’s “10-1”: Volume 4

Renovation PlanMANCHESTER — The renovation of space once occupied by Marcus Communications continues. The direction of water flow through the building has been changed. A system of trenches had been dug for that purpose are close to being filled and sealed.

The album shows before and after photos and framing of the space is well underway. The next steps are to complete framing and start to hang walls.

The overall plan is to have the main entrance be on the south side of the building with a main hallway through the center down to the main vehicle bay. The renovated space will include additional training and simulation areas, a relocated locker area, new offices, a medical supply staging area, and two new restrooms although the plans remain fluid.